Ventilation systems · 2019–2022

Rostov NPP

Development of design documentation and delivery of an equipment package for normal and emergency ventilation systems of two power units. KPU fire valves, ZV air dampers and AV fan units were manufactured in seismic-resistant design per customer specifications. The products passed acceptance inspection at the production site with participation of NPP representatives.

KPU valves — 340 pcs.ZV dampers — 180 pcs.AV fan units — 24 pcs.
Air conditioning · 2020–2023

Novovoronezh NPP-2

Comprehensive delivery of air conditioning systems for the reactor and turbine building rooms of a power unit under construction. ATM-KhM chillers were manufactured in hermetic-resistant design, ShSAU-A cabinets in seismic-resistant design. Full acceptance inspection was carried out with issuance of passports and declarations of conformity.

ATM-KhM air conditioners — 56 pcs.Outdoor units — 28 pcs.ShSAU-A cabinets — 12 pcs.
Fire protection · 2021–2024

Kursk NPP-2

Delivery of fire doors and specialized smoke ventilation control cabinets for a new power unit. The doors were manufactured with a sealed rebate to provide the required smoke and gas penetration resistance. The cabinets passed vibration and seismic tests in an accredited laboratory.

Fire doors — 120 pcs.Smoke ventilation cabinets — 18 pcs.Hermetic valves — 96 pcs.
Air filtration · 2022–2024

Smolensk NPP

Delivery of filtration units and ROU recirculation units for air purification systems in controlled access zones. The absorber filters are designed to capture radioactive aerosols and iodine. The documentation passed expert review at FSUE Atomtechenergo; all products were manufactured per approved design documentation.

Absorber filters — 44 pcs.ROU units — 8 pcs.Filtration units — 16 pcs.
Ventilation systems · 2018–2019

Leningrad NPP

Delivery of ventilation equipment for operating power units: KPU fire valves and VZ air dampers.

KPU valves — 120 pcs.VZ dampers — 64 pcs.
Ventilation systems · 2017–2019

Kalinin NPP

Delivery of fire valves and fans for ventilation systems of operating power units.

Fire valves — 88 pcs.Fans — 18 pcs.
Filtration, ventilation · 2016–2018

Balakovo NPP

Delivery of HEPA filters and ZV valves for filtration and ventilation systems.

HEPA filters — 36 pcs.ZV valves — 54 pcs.
Prospective project · 2023–2025

Nizhny Novgorod NPP

Prospective project: development of design documentation and pre-delivery inspection.