Fire protection · 2021–2024
Kursk NPP-2
← All projects
Delivery of fire doors and specialized smoke ventilation control cabinets for a new power unit. The doors were manufactured with a sealed rebate to provide the required smoke and gas penetration resistance. The cabinets passed vibration and seismic tests in an accredited laboratory.
Supplied
Fire doors — 120 pcs.
Smoke ventilation cabinets — 18 pcs.
Hermetic valves — 96 pcs.
- Period
- 2021–2024
- Projects
- Fire protection
