Air conditioning · 2020–2023
Novovoronezh NPP-2
← All projects
Comprehensive delivery of air conditioning systems for the reactor and turbine building rooms of a power unit under construction. ATM-KhM chillers were manufactured in hermetic-resistant design, ShSAU-A cabinets in seismic-resistant design. Full acceptance inspection was carried out with issuance of passports and declarations of conformity.
Supplied
ATM-KhM air conditioners — 56 pcs.
Outdoor units — 28 pcs.
ShSAU-A cabinets — 12 pcs.
- Period
- 2020–2023
- Projects
- Air conditioning
